Projects
A showcase of our successfully delivered engineering and oil & gas projects, executed with safety, precision, and reliability.
Heavy Lift & Installation of DLB Kennena Laybarge
Executed the heavy lift and offshore installation of the DLB Kennena laybarge for Westfield, ensuring safe handling, precision placement, and seamless integration.
- Strict adherence to HSE and industry standards



24 Sectional Replacement at Oghuala
Successful execution of a 24-inch pipeline sectional replacement at Oghuala, delivering enhanced pipeline integrity, improved flow efficiency, and minimal operational downtime.
- Strict adherence to HSE and industry standards
- Minimal downtime with efficient project execution
- Safe removal and replacement of a 24-inch pipeline section
- Comprehensive testing, inspection, and successful commissioning



1.2km River Crossing Pipeline Installation
- Dual pipeline system (10-inch & 14-inch)
- 1.2km pipeline installation across river terrain
- Strict adherence to safety and QA/QC standards
- Use of marine vessels and heavy lifting equipment
- Completed on schedule with high operational efficiency



NGC Gas Metering Station – Kwale
- Pipeline integration and mechanical works
- Reliable and accurate gas measurement system
- Installation of gas metering and control systems
- Instrumentation and calibration of metering equipment
- Compliance with industry safety and regulatory standards



Jetty and Storage Flare Works
Execution of jetty infrastructure and storage flare system works, delivering safe, efficient, and compliant solutions for industrial facility operations.
- Installation of storage flare system
- Jetty infrastructure construction and upgrade
- Pipeline fabrication and mechanical installation
- Delivered with high-quality QA/QC processes
- Compliance with safety and environmental standards



Cathodic Protection for LPG Bullet – Kwale
- Installation of cathodic protection system
- Corrosion prevention for LPG storage bullet
- Compliance with safety and industry standards
- Testing and commissioning of protection levels
- Improved asset lifespan and operational reliability



Clamp Welding of 10 Diebu–Nun River D/L ROW at Ekowe (Swamp)
Execution of clamp welding works on a 10-inch pipeline along the Diebu–Nun River delivery line right-of-way in a swamp environment, ensuring structural integrity and leak prevention.
- Clamp welding on 10-inch pipeline
- Pipeline integrity and leak prevention
- Executed in swamp terrain conditions
- Strict adherence to QA/QC and safety standards
- Efficient project delivery under challenging conditions



28 Split Tee In-Service Welding at PWS–Obodo (Swamp)
Execution of in-service welding of a 28-inch split tee on a live pipeline in swamp terrain, ensuring safe modification without interrupting operations.
- Installation of split tee fitting
- Executed in challenging swamp terrain
- No shutdown or operational disruption
- In-service welding on 28-inch live pipeline
- Strict compliance with safety and QA/QC standards



10 Sectional Replacement at Primabiri (Swamp)
Replacement of a damaged 10-inch pipeline section in a swamp environment, restoring integrity and ensuring safe, continuous operation.
- Executed in swamp terrain conditions
- Improved pipeline integrity and reliability
- Welding, inspection, and testing carried out
- Replacement of 10-inch pipeline section
- Removal and installation of pipeline segment